PROJECT INFORMATION

Location

Hemavan, Västerbotten, Sweden

Client

Hemavan

Application

Ski lift foundations

Energy Sector

High in the Swedish mountains, Hemavan’s biggest-ever expansion is rising on foundations that have never been built before. See how robotic manufacturing cut material use by around 40% – on one of the most logistically demanding sites there is.

World’s first robotically manufactured ski lift foundations · ~40% less material · Winter-tested and CE marked

Fill in the form below to get the full case study and discover:

  • How Hyperion’s physical AI put material only where the structure needs it – and took ~40% out of a conventional design
  • The real logistics and cost advantages of lighter, ready-to-install foundations on a remote alpine site
  • How the foundations were validated through a full winter season and independently approved by Dekra
  • Why the same system is already trusted in water, energy and grid infrastructure – including National Grid in the UK
  • What Hemavan Alpint’s CEO said about building on it

Get the full case study

Enter your details and we’ll send the complete Hemavan case study straight to your inbox.

Want to increase productivity and reduce CO2 emissions?

Get in Touch