PROJECT INFORMATION
Location
Hemavan, Västerbotten, Sweden
Client
Hemavan
Application
Ski lift foundations
Energy Sector
High in the Swedish mountains, Hemavan’s biggest-ever expansion is rising on foundations that have never been built before. See how robotic manufacturing cut material use by around 40% – on one of the most logistically demanding sites there is.
World’s first robotically manufactured ski lift foundations · ~40% less material · Winter-tested and CE marked
Fill in the form below to get the full case study and discover:
- How Hyperion’s physical AI put material only where the structure needs it – and took ~40% out of a conventional design
- The real logistics and cost advantages of lighter, ready-to-install foundations on a remote alpine site
- How the foundations were validated through a full winter season and independently approved by Dekra
- Why the same system is already trusted in water, energy and grid infrastructure – including National Grid in the UK
- What Hemavan Alpint’s CEO said about building on it